Lander & Rogers tenancy fit-out with a Dynalite lighting control solution at 477 Collins St, Melbourne

The project was delivered successfully based on the following specification:

1) Dynalite Lighting Control System utilising the following:
• 4x 3-Channel DALI Ballast Controllers with approximately 500 DALI fittings across the level 15 tenancy fit-out.
• Integration with Somfy Blind Controllers.
• Integration with IT & Concierge Call Systems.
• Integration with AV System.

2) Lighting Control Methodology:

• All areas are covered by Dynalite PIR motion sensors.
• Large meeting rooms controlled by Dynalite Antumbra Display Panels with IT & Concierge Call functionality.
• Training Rooms controlled by Dynalite 7” Touchscreens with 3-way room joining functionality for both lighting and blind control.

To find out more about Dynalite lighting control systems contact us on This email address is being protected from spambots. You need JavaScript enabled to view it.

MYOB Melbourne Head Office tenancy fit-out with a zencontrol lighting control solution, a fully compliant and certified DALI and DALI version 2 system as per IEC62386

The project was delivered successfully based on the following specification:

1) zencontrol Lighting Control System utilising the following:

  • 32 Application Controllers with over 1000 DALI fittings including 124 DALI Emergency fittings across the 4 level tenancy fit-out.
  • Integration with Somfy Blind Controllers.
  • DALI 2 motion sensors and switches.
  • Cloud connectivity for monitoring and support including Emergency lighting testing and reporting.

2) Lighting Control Methodology:

  • All areas are covered by zencontrol DALI2 motion sensors.
  • Large meeting rooms controlled by both zencontrol DALI2 motion sensors & sceneset switches.
  • Enclosed offices and small meeting rooms utilise a combination of zencontrol DALI2 motion sensors & illuminated push-buttons.
  • zencontrol system is integrated with Somfy blind controller for control of both blockout and sheer blinds using a zencontrol sceneset switch.

To find out more about zencontrol lighting control system contact us on This email address is being protected from spambots. You need JavaScript enabled to view it.

 

The Northern Hospital Inpatient Expansion with Human Centric Lighting (Circadian Rhythm) in the ICU bays and ward circulation.

The project was delivered successfully based on the following specification:

1) C-Bus Lighting Control System utilising the C-Bus Automation Controller 5500NAC in combination with Schneider DALI Power Supplies and DALI DT8 type fitting.

2) Circadian Rhythm Lighting Control Methodology:

  • ICU bed bay lighting to cycle through Circadian Rhythm program from 'morning' setting through 'night' setting.
  • Provision for 'EXAM' button on the lighting control panel in each bay which will immediately set all lighting within the bay to 4000K and maximum intensity for patient examination.
  • Circadian Rhythm in all other areas will not be disrupted and continue its cycle. Circadian Rhythm to resume cycle when "EXAM" switched off.
  • ICU ward circulation lighting to cycle through Circadian Rhythm to create a more consistent ambience around the ward.

To find out more about C-Bus lighting control system and circadian rhythm Lighting contact us on This email address is being protected from spambots. You need JavaScript enabled to view it.

HAVE QUESTIONS ABOUT BUILDING AUTOMATION?

The Pulse Automation Solutions team is ready to assist you with any design, technical or specification related questions